Before I forget...
Our original plan for windows was to go for a t-shape, as we had one old window at the back that was in this form, so we thought it might be more "original". However, looking closely at the old photo we found, the windows used to have eight panes (check out the one on the top right).
Admittedly, this was more like a t, with the lower three panes on each side being separated by thin strips, of possibly lead.
Anyway, we wondered what it might look like with eight panes, having moved on to six after the original t idea.
We could try to mimic the eight panes with a t using wider pieces, and then have narrower cross-pieces below, but I think it might be a little too much. Opinions?
Thursday, 29 September 2011
Break on through
Despite all the destruction over the past few months, there were still some walls that need to go, either to just open spaces up, or for new ways through the house. Last Saturday, Jörg and I removed a partition wall in what was the only pre-existing bedroom on the 2nd floor. This was "modern", being made of two layers of cement-bonded wood fibre which sandwiched a layer of styrofoam. This didn't really win much space, but did expose another oak beam and will make it easier to insulate the inside of the roof. We originally planned to have a roof window here, but with two windows in the gable and a new dormer, I think we have enough light! Well, that and it saves a few bob.
Down in the cellars/ground level, we have to open up a couple of new doors to avoid having to go outside when we want to get into cellar 3 and 4.
Opening up between cellar 3 and 4 was easy enough. There was a door here in the past which was simply bricked up with standard red bricks. No idea when this was done, but it's obvious on the little plan to the right, at the bottom left corner of cellar 4, highlighted. A hammer drill and a steel-capped boot later, we had a pretty wide opening (we'll probably have to reduce that to normal door size eventually).
Last night I began working on the doorway between the entry hall (aka cellar 2) and cellar 3, but that's not so easy. This is a relatively new wall (maybe from the 70s or 80s) made of 24cm concrete cavity blocks, and the mortar is pretty strong, unlike the older wall. I at least prepped it with a few cuts of the angle grinder, but ats it was late (and I don't want to be hammering/drilling/swearing loudly too late), I switched to removing plasterboard and the door frame into the vaulted cellar behind the entry hall. Damp is definitely a problem here, as the plasterboard was really soft. It might be better to leave the stone exposed so it can breath a bit, and see if we can control the damp by putting a new floor in, with gravel under it to break the capillary action. Still, we have a nice red sandstone lintel and posts to be cleaned up.
So, this challenge remains:
I made some progress this evening, but quickly realised I need heavier tools, like a proper sledgehammer.
Other minor stuff has been done throughout, like removing most of the remaining electrical cables, so it feels like we're ready to start putting stuff in, but I know we're not... We've also been discussing window design and what renders we should go for on the facade, not to mention what type of external insulation on the north and east sides.
Tomorrow the roof will be finished, when the remaining roof windows are installed. It's looking great, so more over the weekend.
Down in the cellars/ground level, we have to open up a couple of new doors to avoid having to go outside when we want to get into cellar 3 and 4.
Opening up between cellar 3 and 4 was easy enough. There was a door here in the past which was simply bricked up with standard red bricks. No idea when this was done, but it's obvious on the little plan to the right, at the bottom left corner of cellar 4, highlighted. A hammer drill and a steel-capped boot later, we had a pretty wide opening (we'll probably have to reduce that to normal door size eventually).
The reinstated doorway between cellars 3 and 4. |
Exposing the original way into the vaulted cellar |
Door needed here! |
From the other side of the wall. |
Tomorrow the roof will be finished, when the remaining roof windows are installed. It's looking great, so more over the weekend.
Thursday, 22 September 2011
Half covered
It's been a slow couple of weeks on the house. Lutz and crew came back last Friday to put half the roof tiles on, and Holgar put in two of the five roof windows the day before. The rest goes on next Monday and Tuesday, but there's been some leaking on the dormers since some new insulation panels went on last week, and I'd like to fix that first.
Nevertheless, the back of the house looks great!
The building protection agency had "recommended" that we go with these particular tiles, and that particular colour. I was happy with the tiles, but initially would have preferred copper red tather than natural tone, but I think it looks well. I can't rsist one more before and after comparison!
We've been tapping away at reducing the insides to a raw condition, and last Saturday (between family events) I took a couple of hours to repeat the job I did on the east attic tip, this time on the west half. Here's what it was like before, with the top photo taken when the roof was partially open, and the true scope of filth was clear to see. The next shows a slightly clearer scene.
From underneath, staves could be seen holding up clay plaster. Today, we found out that these staves could be a couple of hundred years old, but more of that in a few weeks.Same procedure as last time, meaning the apex is open, and we can consider whether we leave it completely open or make a half floor for storage.
And now this mess has to be cleaned up. We have small piles of old clay plaster all over the place now, waiting for us to get a proper chute to drop it down into a trailer. The staves will be kept, and perhaps reused in other parts of the house (or other smaller projects). My previous thoughts of using them as firewood have been somewhat tempered after today.
A couple of hours each evening after work this week has also meant that all the old electric cables are now removed, and the house it feeling ready for putting stuff in, rather than taking it away. Almost. Still so many decisions to be made...
Nevertheless, the back of the house looks great!
Looking smart! Two roof windows go in on the left next week. |
Two of the roof windows on the west side. |
The building protection agency had "recommended" that we go with these particular tiles, and that particular colour. I was happy with the tiles, but initially would have preferred copper red tather than natural tone, but I think it looks well. I can't rsist one more before and after comparison!
Way before! |
From underneath, staves could be seen holding up clay plaster. Today, we found out that these staves could be a couple of hundred years old, but more of that in a few weeks.Same procedure as last time, meaning the apex is open, and we can consider whether we leave it completely open or make a half floor for storage.
And now this mess has to be cleaned up. We have small piles of old clay plaster all over the place now, waiting for us to get a proper chute to drop it down into a trailer. The staves will be kept, and perhaps reused in other parts of the house (or other smaller projects). My previous thoughts of using them as firewood have been somewhat tempered after today.
A couple of hours each evening after work this week has also meant that all the old electric cables are now removed, and the house it feeling ready for putting stuff in, rather than taking it away. Almost. Still so many decisions to be made...
Sunday, 11 September 2011
Clearing from the top
After a while dithering over what to do with the top couple of floors, which we probably will not be able to afford finishing in this first iteration, we decided the best thing to do is completely clear them so they are in a clean and raw state. That way, when we do begin to build upwards, we won't be dragging piles of old wood and extremely dusty clay and straw plaster (daub) down through the finished parts of the house in years to come. So, the best plan: a clearout, starting from the top.
First task, removing the half-dilapidated floor/ceiling from the top attic floor, to so-called Spitzboden.
After considering half-floors and galleries, the simplest thing to do here is open up the floor to fully expose the beams, and perhaps build a half floor, accessed with a ladder. Would make a cool place to stick a bed.
So, trusty crowbar and hammer in hand, after a few hours I cleared the east half to leave the beams and piles of clay and wood. This is extremely dusty work, and the shot below is only after pulling a few handfulls of loose clay plaster down.
The rest was done from above, hacking at the clay over the laths, and simply letting everything drop down, later sorting out timber from clay for proper disposal. It's like exposing the bones of a beast, but it's worth it, as we're left with a blank canvas to build on.
Not as fun as last weekend, when I had three others to help, but satisfying nonetheless. The west half (basically a mirror image of the above) needs the same treatment, and I'm sorely tempted to give the the floor below the same, so we can refresh the floor boards, replaster between them (the oak staves between the beams are currently visible, with bits of plaster still clinging to them) and hide cables at the same time. But that's another day's work.
First task, removing the half-dilapidated floor/ceiling from the top attic floor, to so-called Spitzboden.
Before: Lots of planks and rubbish. |
The view from below before commencing.. |
So, trusty crowbar and hammer in hand, after a few hours I cleared the east half to leave the beams and piles of clay and wood. This is extremely dusty work, and the shot below is only after pulling a few handfulls of loose clay plaster down.
The rest was done from above, hacking at the clay over the laths, and simply letting everything drop down, later sorting out timber from clay for proper disposal. It's like exposing the bones of a beast, but it's worth it, as we're left with a blank canvas to build on.
After: nice and open, ready for lining the inside of the roof. |
The view from below, after the dust settled. |
From the other end, imagining a half floor. |
Saturday, 10 September 2011
Leaving their mark
A bit like modern graffiti, I guess there's always been a desire for people to leave their mark somewhere. We've seen a few initials carved into bricks outside our house, but some recent finds made me lough out loud, just from the pleasure of finding something new, and personal.
Just inside the door on the brick machine room, to the right, between the house and barn, we saw KW, OW and EL. I didn't pay much attention to it, knowing that at least KW was the father of the people we bought the house from, and being pretty sure the machine room wasn't really all that old.
It wasn't till I stuck my head out one of the small windows, right up at the third level, that the initials took on greater significance, simply in terms of the lives that were led in this house over a long time. On the sill, I found 19 OW 52. So we know that the OW on the machine room was making their mark around that time. I spoke with the previous owner today (it was really nice they just popped by to say hello while I was gutting the attic), and she thought OW was her grandmother, but I would guess OW was fairly old in 1952, so not sure if she would have been making her mark then.
Nevertheless, we'll talk to the previous owners about the family tree and try to piece that together. But it seems reasonable that the KW, OW and EL from the machine room are fairly contemporary, along with the 19 OW 52 one from the attic.
KW was the father of the previous owner, and it's likely he marked the bricks. But we know a (different) KW was the grandfather and a third KW was the great-grandfather. So imagine how tickled I was to find, on the same window surround, as the 19 OW 52, a much fancier KW, complete with serifs, and the year 1880.
I think we might have a photo of this man, but I'll ask permission to reproduce it first. But this made me laugh out loud. The thoughts of a young man, or perhaps a boy, carving this into the window frame with such care, three stories up in a grain storage room, where practically nobody would see it in the 131 years that passed till this photo was taken. Brilliant!
This wood had been covered by corrugated sheeting for the past 25 years, but I'm still amazed at how fresh it looks, protected as it is by being near the top of the frame before the cladding was put up. I was so intrigued, I had to climb up the scaffolding outside to get a better impression. It was the first good look I've had of the half-timbered construction from the outside, and it certainly looks like it's been there a long time, being well-weathered.
As well as lots of carpenters marks on this gable wall, there was one more, fairly recent inscription, presumably put there by the man who erected the corrugated sheeting that covered this gable till a couple of months ago. 1986 Adolf Gruber, written in pencil on the whitewash, 11 metres above ground level right at the apex.
Presumably his helpers had certain opinions of him, as I doubt the sketch below was a self-portrait!
Just inside the door on the brick machine room, to the right, between the house and barn, we saw KW, OW and EL. I didn't pay much attention to it, knowing that at least KW was the father of the people we bought the house from, and being pretty sure the machine room wasn't really all that old.
It wasn't till I stuck my head out one of the small windows, right up at the third level, that the initials took on greater significance, simply in terms of the lives that were led in this house over a long time. On the sill, I found 19 OW 52. So we know that the OW on the machine room was making their mark around that time. I spoke with the previous owner today (it was really nice they just popped by to say hello while I was gutting the attic), and she thought OW was her grandmother, but I would guess OW was fairly old in 1952, so not sure if she would have been making her mark then.
It could be 18OW52, but pretty sure it's 19OW52 |
KW was the father of the previous owner, and it's likely he marked the bricks. But we know a (different) KW was the grandfather and a third KW was the great-grandfather. So imagine how tickled I was to find, on the same window surround, as the 19 OW 52, a much fancier KW, complete with serifs, and the year 1880.
I think we might have a photo of this man, but I'll ask permission to reproduce it first. But this made me laugh out loud. The thoughts of a young man, or perhaps a boy, carving this into the window frame with such care, three stories up in a grain storage room, where practically nobody would see it in the 131 years that passed till this photo was taken. Brilliant!
This wood had been covered by corrugated sheeting for the past 25 years, but I'm still amazed at how fresh it looks, protected as it is by being near the top of the frame before the cladding was put up. I was so intrigued, I had to climb up the scaffolding outside to get a better impression. It was the first good look I've had of the half-timbered construction from the outside, and it certainly looks like it's been there a long time, being well-weathered.
As well as lots of carpenters marks on this gable wall, there was one more, fairly recent inscription, presumably put there by the man who erected the corrugated sheeting that covered this gable till a couple of months ago. 1986 Adolf Gruber, written in pencil on the whitewash, 11 metres above ground level right at the apex.
Presumably his helpers had certain opinions of him, as I doubt the sketch below was a self-portrait!
Sunday, 4 September 2011
With a little help from my friends
Saturday was a busy day. My "brother-in-law", Chris, had offered to help, so stayed overnight so we could get an "early" start. His friend, René offered to help, despite not knowing me from Adam, and a neighbour I had also never met, Jörg, offered to help. Another neighbour loaned us their tractor and trailer to dispose of stuff that had been lying around in the house for months, and the remaining plasterboards we planned to remove.
Having whittled away on a room-by-room basis on my own for the past few months, it's amazing what can be done with four guys and a bunch of wrecking bars. Pretty much all the remaining false ceilings and dry-lined walls were removed and disposed of, and there's now a mountain of laths piles outside the house. Working from 10:30 till 6pm in pretty hot weather, with a break for beef stew and a beer, we steamed through it!
A great way to get to know people, and engage in community spirit, it was great, and the beers (some home made by me) and the home-made Wurst from Jörg from 6pm till 11pm were even better! Enough words, here are some summary pictures.
The apparent new door in the centre of the photo above is actually where the chimney was. While having a door straight into the kitchen from here might be nice, we'd lose valuable wall space for kitchen units. But look at all that lovely wood now exposed!
There are always surprises to be found. I expected the ground floor wall in the stairwell to be stone, like the rest of walls at that level, but it was rebuilt some time with concrete blocks.
The landing on the second floor was also coated in plasterboard, and the guys did a neat job tidying it up and exposing the half-timbered construction (and a view through the dormer).
The roof was also completed as far as possible on Friday. Lutz will return in a couple of weeks to put the roof tiles on.
The outside is looking a lot more promising than the inside!
Having whittled away on a room-by-room basis on my own for the past few months, it's amazing what can be done with four guys and a bunch of wrecking bars. Pretty much all the remaining false ceilings and dry-lined walls were removed and disposed of, and there's now a mountain of laths piles outside the house. Working from 10:30 till 6pm in pretty hot weather, with a break for beef stew and a beer, we steamed through it!
René, Chris, Jörg and your's truely. |
A great way to get to know people, and engage in community spirit, it was great, and the beers (some home made by me) and the home-made Wurst from Jörg from 6pm till 11pm were even better! Enough words, here are some summary pictures.
1st floor bedroom, before. |
1st floor bedroom, now. |
Main stairwell, July 2010. |
And now. |
Looking up, to the first floor. |
Looking down, to the 1st floor. |
Landing on the 2nd floor. |
2nd floor landing in the other direction, before. |
2nd floor landing now. |
The roof was also completed as far as possible on Friday. Lutz will return in a couple of weeks to put the roof tiles on.
The outside is looking a lot more promising than the inside!
Thursday, 1 September 2011
Roof almost complete
I have to say, Lutz, the carpenter/roofer and his team work like demons. They start at 7am and work till 5pm, at least, and in the past two days I've been away, the back of the house has been transformed. The roof is now watertight, apart from the gable dormer, and is ready for tiles which will come in about 2 weeks. A new roof frame has been built for the gable dormer, and it looks great. The roof windows need to be put in, but that'll just be a matter of cutting holes in the insulation boards. Speaking of which, these boards were a change from the original plan, and I'm pretty happy with the suggestion from Lutz. 35mm thick, wood-based insulation boards which are breathable, give an initial layer of insulation and sound-proofing, and they are environmentally friendly. They'll eventually be backed up with cellulose insulation to keep us snug.
There are a couple of open points that we didn't know were open points relating to the use of these insulation boards on the sides of the dormers on the front of the house, but a decision is needed soon, as this is delaying the gutter guy. I think I like the idea of using these boards there too (the gable dormer at the back has 55mm thick boards on the sides), but it means doubling up on some work that was already done. I'll have to make an executive decision.
Meanwhile, last Saturday I took the rest of the plasterboard ceiling down in the expanded kitchen. That was pretty dusty, with layers of clay dust from the original ceiling, and all sorts of grain lying above the boards and, in one corner, an old rodent toilet with piles of shit and a little skeleton. The ceiling above is mostly original, with clay-covered laths between oak beams. In the foreground of the picture below, it can be seen that some of these were replaced in the 70s. Most impressive, is the 6-metre-long beam spanning the entire width of the kitchen, finally fully exposed. A new post has to go back in the middle, as otherwise the house would likely sink in on itself.
The plan here is to leave the oak beams exposed and plaster between them. The newer ones can be completely covered, as they are modern tat. We'll see how far we get.
This weekend, it's going to be a big cleanup operation with three people coming to help. My "brother-in-law", his friend, and a neighbour I have never met, but who offered to help. Plan is to remove all the remaining dry lining and clear all the piles I've accumulated since early this year onto a trailer for proper disposal. Well, that and some food and beers for the helpers!
Back of the house, September 1st, 2011 |
The view of the future bathroom inside the gable dormer. |
Up at the apex. |
Meanwhile, last Saturday I took the rest of the plasterboard ceiling down in the expanded kitchen. That was pretty dusty, with layers of clay dust from the original ceiling, and all sorts of grain lying above the boards and, in one corner, an old rodent toilet with piles of shit and a little skeleton. The ceiling above is mostly original, with clay-covered laths between oak beams. In the foreground of the picture below, it can be seen that some of these were replaced in the 70s. Most impressive, is the 6-metre-long beam spanning the entire width of the kitchen, finally fully exposed. A new post has to go back in the middle, as otherwise the house would likely sink in on itself.
Kitchen ceiling, September 1, 2011. |
The plan here is to leave the oak beams exposed and plaster between them. The newer ones can be completely covered, as they are modern tat. We'll see how far we get.
This weekend, it's going to be a big cleanup operation with three people coming to help. My "brother-in-law", his friend, and a neighbour I have never met, but who offered to help. Plan is to remove all the remaining dry lining and clear all the piles I've accumulated since early this year onto a trailer for proper disposal. Well, that and some food and beers for the helpers!
Subscribe to:
Posts (Atom)